What customers say
Sun Temple SolarSolar design and installation · San Diego, CA
Serving San Diego and nearby towns
★★★★★5.0 from 5 Google reviews
Private website concept.
San Diego, California
Sun Temple Solar is a solar and EV charger service for San Diego homeowners. It would size array and charger together around your car and SDG&E's EV-TOU-5 hours, then quote them separately. You'd learn the smallest workable charger, whether you need a panel upgrade, and whether the solar is fairly priced.
Per kWh, SDG&E bundled EV-TOU-5 summer total rates effective August 1, 2026. San Diego Community Power customers pay a different total on the same clock. Weekends and holidays are super off-peak from midnight to 2 p.m.
San Diego, California
Sun Temple Solar works San Diego's EV owners, where solar, the charger and the time-of-use window only pay if they are designed as one system. We size the array and the charger together, then quote them apart.
What customers say
Serving San Diego and nearby towns
★★★★★5.0 from 5 Google reviews
What we do
Call or visit
| Phone | (619) 247-0601Call to book an assessment. |
|---|---|
| Estimates | Free, in writingDesign and price as separate documents. |
Why homeowners pick us
Our story
Installing across San Diego, Chula Vista, La Mesa, El Cajon and Encinitas.
Where we work
The answer sets the array and the charger. Each bar is one day on the rate clock; the dark line under it is when the car is parked at home.
Enter how far the car goes and pick a charger and a start time. The planner shows the energy your car needs each night, how long the charger takes, and what a year of charging at that hour costs on EV-TOU-5. Your numbers stay on this page.
Illustrative calculation. SDG&E bundled EV-TOU-5 total rates effective August 1, 2026, per kWh: summer 13.09¢ super off-peak, 49.63¢ off-peak, 80.21¢ on-peak; winter 12.33¢, 46.57¢ and 52.38¢. San Diego Community Power customers pay a different total on the same clock. The longer charging time allows about 10% for charging losses; the cost leaves losses and the Base Services Charge out.
Energy each night
9.4 kWh
About 3,429 kWh a year: 12,000 miles ÷ 3.5 miles per kWh.
Charging time
2.4–2.7 h
At 3.84 kW (16 A at 240 V). Fits inside the super off-peak window.
A year of charging at this hour
$449
100% super off-peak. The cheapest hours on the plan.

A commuter car driven 12,000 miles a year at 3.5 miles per kWh needs about 9.4 kWh a night, and a 16-amp charger puts that back in under three hours (Illustrative example, worked through below). For most drivers, then, charger size is the easy part. What shapes the design is when your car is parked at home.
Two units come up on every quote. A kilowatt-hour (kWh) is an amount of energy, like fuel in a tank. A kilowatt (kW) is the rate it flows. Your car needs a number of kWh each night; chargers and solar arrays are rated in kW.
We treat the array and the charger as one design problem, because they share three things: your electrical panel, your rate plan and, sometimes, your permit.
It is meant for City of San Diego owners of a single-family home, duplex or townhouse who drive an EV or are buying one. SDG&E delivers the power. The generation itself comes from San Diego Community Power (SDCP) by default, or from SDG&E if your household opted out. The first page of your bill says which.
What you'd get :
Coverage of San Diego and nearby cities covers these towns.
New solar in San Diego goes on the CPUC's Net Billing Tariff, which SDG&E calls the Solar Billing Plan. Power you send to the grid earns an hourly credit that the CPUC says is usually lower than the retail rate. The original customer keeps that export price schedule for nine years. SDG&E customers are excluded from the extra export adder that PG&E and SCE customers can get. And a new solar customer must take an electrification time-of-use rate, which at SDG&E means EV-TOU-5.
EV-TOU-5 prices power by the clock. Per SDG&E:
Under SDG&E bundled EV-TOU-5 rates effective August 1, 2026, summer super off-peak power costs about 13¢ per kWh, off-peak about 50¢ and on-peak about 80¢.
That spread is what decides the array size. A car that charges after midnight pays about 13¢ a kWh. Panels added "for the car" would mostly produce at midday, when the car is away, and export that power for a low hourly credit. A car that sits at home on weekday middays is different: it can soak up solar that would otherwise leave the house cheaply.
| How the car is used | When it's home to charge | Starting point |
|---|---|---|
| Weekday commuter | Evenings and nights | House only; charge midnight to 6 a.m. |
| Works from home or retired | Weekday middays | Price house plus car against overnight charging |
| Charges mostly at weekends | Weekend mornings | House only; weekend hours to 2 p.m. are already super off-peak |
| Can only charge in the late afternoon | 4 p.m. onward | Fix the charging time before adding panels |
Use a simple yardstick. If the car would otherwise charge after midnight, a panel added for it can save at most about 13¢ for each kWh it puts into the car (SDG&E bundled, summer). Ask the sizing note which price it assumes the extra solar replaces. If the answer is the 80¢ on-peak price, the math is flattering the panels.
A battery isn't needed for cheap charging, either. Weekday overnight power is already the lowest price on the plan, so we list any battery as an optional line, never as the way to charge the car.
You want the charger that refills your car inside the six-hour weekday window, not the biggest one on the spec sheet. Three steps get you there:
The Department of Energy's home charging guide says many drivers meet their daily needs overnight with Level 1, a standard 120-volt outlet on a dedicated circuit. It points to Level 2 for longer commutes, irregular schedules or large batteries. It also notes that the electrical code treats EV charging as a continuous load, so the circuit has to be sized to carry full current for hours. That's why Quote B should state both the charger's amps and the breaker size.
For a car needing 9.4 kWh a night (Illustrative example; the slower figure in each range allows about 10% charging losses, an assumption):
| Charger | Power at 240 V | Hours to add 9.4 kWh |
|---|---|---|
| 16 A | 3.84 kW | about 2.5 to 2.7 |
| 24 A | 5.76 kW | about 1.6 to 1.8 |
| 32 A | 7.68 kW | about 1.2 to 1.4 |
| 48 A | 11.52 kW | about 0.8 to 0.9, on a much larger circuit |
All four fit this driver's window. What separates them is what each asks of your panel. A smaller charger may fit the service you already have where a larger one may not. The load calculation, an electrician's tally of everything your panel must carry at once, settles it, and it is the document to ask for whenever a quote includes a panel upgrade.
If the car is still on order, you have a choice. You can have the circuit run while the solar crew is on site, or wait and do the whole charger job later. The City's charger bulletin says pre-wiring for a future charger needs an electrical permit, and the charger itself then gets its own permit when it goes in. So pre-wiring doesn't save the second permit; it can save opening walls twice and lets the load calculation include the car from day one. Ask Quote B to price both versions: pre-wire now, and full install later.
We start with an on-site visit of about two hours (Illustrative duration; a real operator would set it). It would check five things:
After the visit, Sun Temple Solar's service would put four things in writing :
Optional lines, each priced on its own: battery, main panel or service upgrade, second charger, roof work. Quote B covers charging only. Backup power, if you want it, is a separate conversation.
Illustrative example. A City of San Diego household on SDG&E bundled supply drives one EV 12,000 miles a year at 3.5 miles per kWh.
- Nightly need (Illustrative calculation): 12,000 ÷ 3.5 = about 3,430 kWh a year, or about 9.4 kWh a night.
- Charger: a 16 A unit (3.84 kW) refills that in about 2.5 to 2.7 hours, well inside midnight to 6 a.m.
- Yearly charging cost at SDG&E bundled EV-TOU-5 summer rates (Illustrative calculation): about $449 if every charge happens at super off-peak, $1,702 at off-peak, $2,750 at on-peak. At winter rates, super off-peak comes to about $423.
- Sizing note: the car is away on weekday daytimes, so the array is sized for the house only.
The same household also holds another installer's bundled quote (Illustrative example): a 7.0 kW DC array (7,000 watts), a 48 A charger with its circuit, and a main panel upgrade, all for $25,400.
- Whole bundle ÷ watts: $25,400 ÷ 7,000 W = $3.63 per watt, about 27% above the $2.85 State benchmark.
- Move the Quote B lines out: charger and circuit $1,850, panel upgrade $3,250. Solar left: $20,300.
- Solar only ÷ watts: $20,300 ÷ 7,000 W = $2.90 per watt, about 1.8% above the State benchmark.
All dollar inputs for the bundle are invented for illustration.
Three things follow. The bundle only looked overpriced because charger and panel money was divided by solar watts. The $3,250 upgrade deserves a direct question: does the load calculation still need it with a 16 A charger instead of a 48 A one? And the charging time matters more than the charger. Moving every charge from summer off-peak to super off-peak is worth about $1,250 a year here (Illustrative calculation, SDG&E bundled).
For an SDCP household the dollar totals differ, because SDCP sets the generation part of the price. The method stays the same.
To see whether the solar part is fairly priced, divide Quote A's cash price by its DC watts. DC watts are the panels' rated outputs added together: twenty 350-watt panels make 7,000 W, or 7.0 kW DC.
Compare the result with California's State benchmark of $2.85 per watt in the EcoGen Solar Cost Index for California (September 2026 Edition, prices as of September 25, 2026). EcoGen's typical California system on that page is 6.70 kW at $19,095, host-owned, before incentives and financing. The Index is a modeled installed price for a representative home system, not a quote, and it prices batteries separately. So before you divide, take out the charger, its circuit, any panel upgrade, any battery and any roof work.
Check the incentive math as well. A quote still subtracting a 30% federal credit for an owned system is out of date; the answers at the bottom of this page explain why.
| Line | Which quote | What moves the price |
|---|---|---|
| Solar array | Quote A | DC watts, module and inverter choice, roof layout; structural review if mounts sit more than 24 inches above the roof |
| Charger and circuit | Quote B | Charger amps, breaker size, and the run length from the panel to where you park |
| Panel or service upgrade | Quote B | Whether the load calculation needs it, and whether load management or a smaller charger avoids it |
| Battery | Optional line | Capacity and model; EcoGen's benchmark excludes it too |
| Roof work | Optional line | Roof age and condition found at the visit |
If a panel upgrade goes on its own electrical permit instead of the solar permit, the City's fee bulletin IB-103 (May 2026) lists $176.57 for a panel replacement or upgrade up to 200 amps.
Whether you end up with one permit or two depends on the charger type. In the City of San Diego, it's the first permit question to put to any installer.
The solar permit. For a single-family home, duplex or townhouse, a rooftop system designed to the Information Bulletin 301 template is self-issued with no plan review up to 38.4 kW AC, per the City's rooftop solar permit page. You apply on the City's Accela portal. That permit may include a panel upgrade of up to 320 amps, a battery of up to 38.4 kWh (each unit no more than 20 kWh) and an inverter-integrated EV charger: one built into the solar inverter, not a separate wall unit.
The City's IB-301 (October 2025) also says who may sign the plans: a registered civil or electrical engineer, or a contractor with a C-10 (electrical), B (general) or C-46 (solar) license. When a panel upgrade is proposed, a C-10 or a registered electrical engineer must sign. Mounts more than 24 inches above the roof trigger structural review.
A stand-alone charger. A wall charger in a private garage needs its own Simple No-Plan electrical permit. Under IB-187 (May 2026), you file a City Circuit Card (DS-1779A) with load calculations instead of plans.
| Inverter-integrated charger | Stand-alone wall charger | |
|---|---|---|
| Permit | Rides on the self-issued solar permit | Its own Simple No-Plan electrical permit |
| Paperwork | Solar plans per the IB-301 template | Circuit Card DS-1779A with load calculations |
| City inspection fee | $275.80 for the first solar system | $264.25 per charger |
| Historic address | Historic review may apply if the solar also needs a building permit | Not eligible for the simple route |
The City doesn't say a stand-alone charger can ride on the solar permit, so plan on two permits if you want a wall charger. The integrated option saves the second permit but ties the charger to the inverter, so ask what happens to charging if the inverter is ever replaced. Neighboring cities run this differently; La Mesa uses a separate charger permit beside its online solar permit.
Know who owns each step. Ask for names, not "we handle it".
Then check your supplier. In the City of San Diego, generation comes from SDCP unless your household opted out. SDCP's Solar Billing Plan page says imports are priced on EV-TOU-5 and billing is monthly. SDCP adds 0.75¢ per exported kWh, or 11¢ for new residential customers on CARE or FERA.
That split is why two similar quotes across the county can print different savings. Coronado and Lemon Grove households are on SDG&E bundled supply today, so the bundled rates above apply directly. National City defaults to SDCP, where the 11¢ equity adder can matter most.
Solar and a charger outlast many sales teams, so plan for the day the installer isn't there. San Diego has seen it: Sullivan Solar Power's own website says it "ceased operation in 2021" and points its customers to another company for support. Your paperwork should still work without the company that sold it.
Take this list to every quote you collect. The quote checklist on this site follows the same order.
The Department of Energy's homeowner's guide to going solar calls NABCEP certification the industry standard. It's worth asking about, but it doesn't replace the license check.
Not for a system or charger installed now. The IRS says the Residential Clean Energy Credit isn't available for property placed in service after December 31, 2025. The home charger credit covered property placed in service through June 30, 2026. California's property-tax exclusion for new solar is scheduled to sunset on January 1, 2027, per the Board of Equalization, so ask how your completion date affects it.
Run the three steps above first. If 16 or 24 amps refills your car between midnight and 6 a.m., a bigger unit mostly adds circuit cost and raises the odds of a panel upgrade.
No. Weekday super off-peak, midnight to 6 a.m., is the cheapest power on EV-TOU-5. A battery is a separate, optional line.
Add both cars' nightly kWh and check the total against the six-hour window. If one charger covers both, a second stays optional. If it doesn't, ask about load management before anyone prices a service upgrade.
Not for a new system. The CPUC moved new interconnection applications to the Net Billing Tariff from April 15, 2023; households already on NEM 2.0 keep it for 20 years from interconnection. A new quote should model hourly export credits.
Choose your city and what you want priced. The site builds the checklist to bring to any installer's quote visit, in the same order as the questions in the guide, with the permit and supplier notes for your city.
It runs on this device. Nothing is sent or stored.